Europe’s largest bottling plant faced a challenge that is common across high-volume manufacturing: the reliance on costly carbon dioxide supply. With rising expenses and sustainability pressures, the business wanted to explore whether switching to on-site nitrogen generation could deliver the efficiencies and savings needed to set a new benchmark for its European operations.

The ACE Group was chosen to lead the project following a competitive tender process. Our ability to demonstrate efficiency gains through detailed CAD designs, combined with an insistence on higher food safety standards, set us apart from the competition. What began as a technical installation would ultimately reshape the way this major bottling facility manages its air and gas supply.

Moving from Carbon Dioxide to Nitrogen

The biggest driver for the project was the elimination of carbon dioxide usage in the filling process. By replacing it with nitrogen generated on-site, the plant stood to make millions in savings each year, primarily through the removal of supply, delivery, and rental costs associated with carbon dioxide.

But cost was not the only motivator. Energy consumption was also a critical factor, and we proved that our design would deliver the most efficient setup possible. Air quality, too, came under scrutiny: the plant’s existing oil-flooded compressors carried a risk of contamination. By moving to oil-free technology, we were able to remove that risk entirely, providing reassurance for direct-contact food applications.

Designing the System

From the earliest stages, it was clear that the installation would need to balance a variety of pressures. Space was limited, power upgrades were required, and the distribution network would need to run across nearly two miles of pipework, feeding every production line on site. At the same time, we had to ensure that production continued without disruption throughout the project.

Our engineering team designed a complete compressed air and nitrogen generation system to meet these requirements. Two 250kW fixed-speed oil-free compressors were paired with a 315kW variable-speed compressor, all sequenced by a master controller to optimise performance and give the customer centralised monitoring of the system. A refrigerant dryer was added to reduce the load on the desiccant unit, improving energy efficiency and saving an estimated £70,000 a year.

To ensure purity, the system also incorporated sterile, carbon, and dust filtration, alongside a twin-unit nitrogen generator and dedicated storage. In total, 20,000 litres of first-stage storage air, 10,000 litres of dry air, and 5,000 litres of nitrogen storage were provided, ensuring a stable and reliable supply.

The most significant contribution we made was in raising food safety standards. While the initial specification called for a 1:4:1 air quality ratio, we argued for a stricter 1:2:1 ratio to protect against contamination. The client accepted this higher standard and has since rolled it out across other sites.

Overcoming Obstacles

No project of this scale runs without its challenges. A 16-week delay in the delivery of the desiccant dryer created early setbacks, compounded by hired equipment that proved unfit for purpose. Despite these hurdles, our installation team worked tirelessly to keep the site running, adapting plans to maintain continuity of production.

The result was that the project not only avoided disruption but was also completed a full month ahead of the revised deadline.

Transformative Results

The impact of the new system has been immediate and significant. Financially, the shift away from carbon dioxide usage alone is projected to save £1.5m annually. The refrigerant dryer has reduced energy consumption, creating an additional £70,000 in yearly savings. Operationally, the new system provides redundancy, meaning production peaks can be comfortably managed even if one compressor goes offline. And by moving from oil-flooded to oil-free compressors, the risk of product contamination has been eliminated altogether.

Sustainability gains have also been substantial. By reducing reliance on carbon dioxide, the plant is cutting hundreds of thousands of tonnes of emissions per year, an outcome that strengthens its environmental credentials as well as its bottom line.

A Blueprint for the Future

This installation is the first of its kind for the client, but it is already shaping future plans. The intention is to use this project as the model for sites across Europe, proving the quality, savings, and reliability of on-site nitrogen generation. The ACE Group already manages four UK facilities for the client, and further upgrades are in the pipeline.

For us, the project demonstrates the value of combining innovative engineering with practical delivery. By working closely with the client, overcoming on-site challenges, and insisting on higher standards, we’ve helped Europe’s largest bottling plant achieve a system that is smarter, safer, and far more cost-effective.